You can enter all your Treatment Data at once by simply uploading a spreadsheet!

After your job has been created, you can Upload your Treatment Data Import Files by scrolling down to the Treatment Data Import Files section on the Job View page.  You can also click on the 3-bar button located on the upper right-hand corner of the Job View page, Stage Mappings page, and Treatment Data page, and select Import Treatment Data. If you don't already know the times for the Start and End of each stage, you'll want to set those in Well Data Labs before launching the Treatment Data importer.

Download the template sheet and create your WDL Treatment Data Import. Make sure the well name and API number matches the job information in the application prior to importing your stage data. Every other field will be overwritten using the data in this sheet, so if you aren't positive you want to replace that value, just leave it blank on the Treatment Data Import.  If you need help with filling out the template, click on the Sample Data tab on the spreadsheet.

After you have saved your Treatment Data import template, click on the upload button or drag and drop your files.

 

Once the data import is complete, you’ll see a confirmation message. If there are errors you might need to address, they'll show up in red text on this screen. 

The import log is collapsed under the Details text, just click to expand it.  

Now you can visualize all your data on the Treatment Data or the Job Summary page. Data from your import will be displayed as an override, which you can compare with the meter data calculated from your 1 Second files. Elements that don't use overrides -- like Start and End flags, Job Header fields, and Stage Header fields -- are overwritten by the import, so again, make sure you actually want to replace those things if you include them on your import.

 

The Treatment Data Import is just one of the ways you can quickly load your data into Well Data Labs. You'll want to know about the Bulk Job Importer. And check out how quick it is to set your Start/End times on our Data Mapping Training Video.